Suncoast Parkway 2, also known as SR 589, is a four-lane, limited access toll-road extending north for about 13 miles from the existing Suncoast Parkway. It is part of a regional corridor along the western coast of Florida.

Overview

Lane built the second of two sections that comprise Suncoast Parkway 2. The section runs from South of SR 700 (US 98) to SR 44 in Hernando and Citrus Counties.

The Suncoast Parkway 2 helps reduce commuting times and improves sustainability by contributing to the reduction of emissions along the existing roadway network between Citrus County and the Tampa Bay Region.

Construction started in early 2018 and was completed in April 2023.

RECOGNITION

  • Florida Transportation Builders’ Association’s (FTBA) Disadvantaged Enterprise “DBE” Utilization Achievement Award
  • Florida Transportation Builders’ Association’s (FTBA) 2022 Best in Construction Award

Technical Highlights

This project involved the construction of 15 bridges, more than 4.8 million CY of excavation and more than 3.8 million CY of embankment, milling and resurfacing, base work, drainage pipe, retaining walls, curb and gutter, traffic signals, lighting, highway signing, guardrails, sidewalks, and multi-use trails.