TBM “Chris” Holes Through W Street Intermediate Shaft on North East Boundary Tunnel
The Earth Pressure Balance Tunnel Boring Machine (TBM) “Chris” has reached the W Street shaft, the first and only in-line shaft that the TBM will cross during its 26,700-foot long drive underneath Washington, D.C.